Now showing items 1-2 of 2

    • Joo, I. S.; Turner, W. D.; Song, L.; Dong, D.; Baltazar-Cervantes, J. C.; Napper, G.; Wei, G. (Texas A&M University (http://www.tamu.edu); Energy Systems Laboratory (http://esl.tamu.edu), 2007)
      Continuous Commissioning (CC) is a proven, highly cost-effective process that can improve building comfort and reduce energy consumption. This paper discusses the CC of three public schools in Austin, Texas. These schools ...
    • Yagua, C.; Wei, G.; Napper, G.; Turner, D.; Effinger, M.; Shahsavary, F. (Energy Systems Laboratory (http://esl.tamu.edu), 2009-11)
      This paper presents a case study for the optimization of a multipurpose facility in a school district. The facility is a single-story building with a total conditioned area of 35,571 ft2. It contains a full size basketball ...